FILM PARK
BABELSBERG

SYSTEM PRODUCTION ONYX

MAKING
(FOR) THE RUNWAY.

  • DURATION

    2 days

  • SERVICE

    Onyx system production

  • LOCATION

    Babelsberg Film Park

  • CITY

    Potsdam

  • COUNTRY

    Germany

SITUATION

1656 m² system production Onyx

  • Cleaning the surface
  • Preparing the area for Onyx (covering)
  • Application of bonding agent to the surface
  • Even application of Onyx in 2 layers

PROBLEM

Thinned and cracked asphalt surface

SOLUTION

Sealing cracks with joint material, sealing the surface with Onyx

Cleaning of the old asphalt surface

Dosed and targeted application of the Onyx material

Area after Onyx treatment

Onyx surface close-up