CONSTRUCTION AND REPAIR
MUNICH AIRPORT

PROBLEM

Damaged concrete slabs – a slab with two integrated parts was destroyed

CHALLENGE

  • Short construction time, as airport operations must be maintained
  • Cable duct near the edge

SOLUTION AND VALUE

Prefab slab

  • Integrated parts already installed during the production of the prefab part
  • No chamfer at the surface for the cable connection
  • No on-site core drilling required
  • Replacement of the slab including connection of the aircraft warning light in a single night

Removal of the damaged concrete slab

Removal of the damaged concrete slab

Preparing for the insertion of the prefab concrete part

Damaged concrete slab

Connection of the aircraft warning light

Construction plan

Connection of the aircraft warning light

Silica resin injection

Levelling of the new prefab concrete part

Insertion of the prefab concrete part

Damaged concrete slab