REPLACING OF CONCRETE SLABS WITH IN-SITU CONCRETE / LANE WISE REPLACEMENT OF CONCRETE PAVEMENTS

Concrete traffic areas stand out due to their durability and resistance to a variety of stress factors from traffic, the environment or chemicals. However, sometimes a concrete surface’s individual slabs fail and have to be replaced. OAT offers the right solution for this.

MOBILE REPAIR FOR FAST
RETURN TO MOBILITY.

APPLICATION

Replacement of damaged slabs or parts of slabs as well as lane wise replacement in any kind of concrete traffic areas (motorways, aircraft movement areas, industrial areas etc.) according to ZTV BEB-StB

Use of quick set concrete, early-strength road concrete or road concrete

TECHNOLOGY

Powerful large-scale equipment to produce separating cuts

Excavator for lifting out damaged slab parts and placing the concrete

Modified paving mixers and state-of-the-art continuous mixers to produce concrete on the construction site

Screeds and paver finishers for surface treatment

Separating cuts according to surface thickness

Vibration-free removal of the concrete slab

Anchor and dowel bar fitting

Prepared support layer with interlayer

Quick set concrete paving

Surface machining

Lane wise replacement of concrete surfaces

Production of surface texture

COMPELLING REASONS FOR
OUR SERVICES.

ADVANTAGES (DEPENDING ON MATERIAL)

Rapid strength development, even at low temperatures

Compressive strengths to reopen roads to traffic after 2 to 4 hours, depending on the choice of material

High resistance to frost and de-icing salt after just 12 hours

Short time windows for closures in day or night shift work, resulting in less traffic obstruction due to traffic jams (availability)

Reduced construction time due to less closure time

Flexible and quick change of locations using mobile mixers

No damage to the adjacent concrete surfaces by cutting the concrete slabs and non-destructive removal of the damaged areas

No transport of the finished concrete mixture thanks to production on site, thus ensuring compliance with the processing time and eliminating the risk of traffic jams

High resistance and service life under maximum loads due to high final strengths of C60/75

Processing, organisation and execution of all individual works is done entirely in-house